Olam International Limited v Pacific Basin Supramax Limited - The Grande Island
DMC/SandT/26/17
England
Olam International Limited v Pacific Basin Supramax Limited (The “Grande Island”)
English Commercial Court: HHJ Hodge KC: [2026] EWHC 2136 (Comm): 14 August 2026
Judgment available on BAILII @ https://www.bailii.org/ew/cases/EWHC/Comm/2026/2136.html
Steven Berry KC (instructed by Hannaford Turner LLP) for Olam (Charterers)
Alexander Wright KC (instructed by Floyd Zadkovich LLP) for Pacific Basin (Owners)
TIME CHARTER: NIGERIAN PIRACY RISKS: WHETHER VESSEL OFF-HIRE FOR SHIFTING TO SAFE ANCHORAGE: WHETHER DELETION OF SUB-CLAUSES (A) AND (B) OF BIMCO PIRACY CLAUSE FOR TIME CHARTER PARTIES 2013 MEANT VESSEL COULD NOT LEAVE AREA AFFECTED BY PIRACY RISKS UNDER SUB-CLAUSE (C)(I) AND DID NOT REMAIN ON-HIRE WHILE DOING SO UNDER SUB-CLAUSE (D)(I): APPEAL FROM FINAL ARBITRATION AWARD ON POINT OF LAW UNDER SECTION 69 OF THE ARBITRATION ACT 1996
(N.B. Charterers’ application to appeal further to the Court of Appeal was dismissed by the Commercial Court, and so this judgment is now final and unappealable.)
Summary
On an appeal from a final arbitration award under s.69 of the Arbitration Act 1996, the Commercial Court considered whether Owners who withdrew their Vessel from the roads at Warri because of piracy risks were entitled to do so under sub-clause (c)(i) while she remained on-hire under sub-clause (d)(i), of the BIMCO Piracy Clause for Time Charter Parties 2013, where the parties had incorporated that clause but with the deletion of sub-clauses (a) and (b).
The dispute turned on the relevance and effect of that deletion. Charterers contended that striking out the only sub-clauses conferring an express liberty to leave an area manifested an objective intention that the Vessel should have no such liberty. Owners submitted that the retained liberty to take “reasonable preventative measures” under sub-clause (c)(i) was a distinct right, unaffected by the deletion. The Commercial Court preferred the latter view because sub-clause (c)(i) was unambiguous, so the deleted sub-clauses were inadmissible.
Case note contributed by Alexandra Kosta-Foti. Alexandra is a Visiting Lecturer in Contract Law and Equity and Trusts at King’s College London and City St. George’s University, and a future pupil barrister at Quadrant Chambers.
Background
Pacific Basin Supramax (“Owners”) let their bulk carrier “Grande Island” (“Vessel”) to Olam International (“Charterers"), by a recap email incorporating an amended NYPE form with additional clauses (“Charter”), to perform a one time charter trip from Belgium to Nigeria carrying a cargo of bulk wheat. The Charter included:
(a) a standard off-hire clause (17) for hire to be suspended should the Vessel “deviate or put back during a voyage, contrary to the orders or directions of the Charterers”, save where permitted by the liberties clause;
(b) a liberties clause (22) permitting the Vessel “to deviate for the purpose of saving life and property”;
(c) an additional clause (79), the BIMCO War Risks Clause for Time Chartering 2013 (CONWARTIME 2013), incorporated unamended, under which the Vessel was not obliged to proceed or continue to or through an area exposed to war risks (defined to include piracy), with a liberty to leave an area which became dangerous after entry;
(d) an additional clause (81), the BIMCO Piracy Clause for Time Charter Parties 2013 (“Piracy Clause”), incorporated by the recap on terms “to apply, delete a + b”. This removed the sub-clauses entitling Owners to refuse to proceed to, or to leave, an area judged dangerous by reason of piracy and obliging Charterers to give alternative orders with the Vessel remaining on hire. It retained sub-clause (c)(i), giving Owners the liberty “to take reasonable preventative measures to protect the Vessel, crew and cargo including but not limited to re-routeing within the Area, proceeding in convoy, using escorts, avoiding day or night navigation, adjusting speed or course, or engaging security personnel”, and sub-clause (g), deeming anything done in compliance with the clause to be due fulfilment of the charterparty and not a deviation; and
(e) a bespoke “Nigerian trading clause” in the recap. This required the Vessel to wait at the Lagos anchorage until ordered to berth, to carry a minimum of seven armed Nigerian naval guards between discharge ports at Charterers' time and cost, and to have a citadel. It also gave the Vessel the right to sail out and wait offshore in the event of congestion at Port Harcourt or of the berth at Calabar not being free, but made no equivalent provision for Warri.
The Vessel proceeded to the discharge port of Warri, in the Gulf of Guinea, where she tendered notice of readiness but was unable to berth. The dangers of pirate attack in the Gulf of Guinea were, as the arbitral tribunal later found, “well known to everyone involved in the shipping industry”, and the risks, although reduced by naval patrolling, were “not insubstantial”.
As a result, Owners were unwilling for the Vessel to wait at the Warri anchorage, following a piracy incident in the vicinity being reported to the Master, and so ordered her to leave the roads and return to the safe anchorage at Lagos. The Vessel was away from Warri for approximately three days, between 13 December and 16 December 2021, after which she returned, once she was able to proceed up the river and berth at Warri port.
A dispute between Owners and Charterers, about whether or not the Vessel was on-hire or off-hire for that period, was referred to arbitration in London. Charterers’ case was that, with sub-clauses (a) and (b) of the Piracy Clause deleted, the Vessel had put back otherwise than “for the purpose of saving life and property” and was, therefore, off-hire under clause 17. Owners opposed such construction because sub-clauses (c)(i) and (d)(i) clearly allowed the Vessel to depart Warri for Lagos to avoid piracy risks while remaining on-hire.
By a final award dated 2 January 2025, the arbitral tribunal, consisting of three experienced maritime arbitrators, held unanimously in Owners' favour that the Vessel had remained on-hire under sub-clause (d)(i) of the Piracy Clause. It found that there was in fact a risk of piracy at Warri and that the temporary return to the safe anchorage at Lagos was a “reasonable preventative measure” within sub-clause 81(c)(i). It added that there would be “no reason for rational commercial parties to exclude putting back from the scope of clause 81”. As a result, the arbitral tribunal found it unnecessary to decide Owners' alternative cases under clauses 17 and 79.
Charterers sought to appeal the award to the Commercial Court under section 69 of the Arbitration Act 1996 on the basis that by deleting sub-clauses (a) and (b) of the Piracy Clause the parties had “manifested an objective intention that the Vessel would not be at liberty to leave an area exposed to the risk of piracy”. If Charterers were correct, then the Vessel was off-hire until the date and time when she returned to Warri anchorage.
HHJ Pelling KC, on the papers only, and so without the benefit of hearing oral argument from the parties, granted permission to appeal, finding that the award was “obviously wrong” because of: (i) the tribunal’s failure to identify the applicable principles of construction; and (ii) how the mutual intention implicit in the deletion of sub-clause (a) of the Piracy Clause was consistent with the conclusion that there was nevertheless an entitlement to remove the Vessel from a piracy risks area, available by operation of sub-clause (c)(i).
Judgment
The Judge dismissed the appeal by two alternative routes, before disposing of Charterers' subsidiary arguments.
Issue 1: whether the deletion was admissible at all
Drawing on Mopani Copper Mines plc v Millennium Underwriting Ltd (fn.1) and Narandas-Girdhar v Bradstock (fn.2), the Judge distilled eight propositions on recourse to deleted words. The critical one was sequential: the Court must first construe the retained words without reference to the deletion, and if they are unambiguous, reference to the deletion is “unnecessary” and, therefore, “impermissible”. The meaning of sub-clause (c)(i) was held to be unambiguous for four reasons.
First, there was nothing in the language of sub-clause (c) to indicate that the “reasonable preventative measures” that may be taken by Owners were limited to measures within that area only. “Re-routeing within the Area” is the only enumerated measure with any territorial limit, and it was introduced by the words “including but not limited to”, which are words of inclusion and not limitation.
Second, the incorporated clause 79(b), in relieving the Vessel of any obligation “to continue to or through any area”, necessarily contemplates departure too. This was necessarily the case because the only express liberty to leave the area conferred by that sub-clause arose upon the area becoming, or a possibility it may become, dangerous after the Vessel had already entered into it. Such liberty must be viewed in the commercial context of whether the parties could have intended that the Vessel remained in such a situation subject to the risks of piracy—in answering in the negative, the Judge identified a necessary correlated right to leave the area.
Third, sub-clauses (e) and (f) demarcated the risks allocation between the parties as to the consequences of the Vessel being attacked. Despite these sub-clauses not having featured extensively in the submissions of either party, the Judge found them illuminating for the simple reason that they point towards the existence of a “substantial financial interest” of Charterers in avoiding any attack or seizure. In turn, “commercial good sense” militated against a restrictive reading of the measures available to prevent it.
Fourth, there was an inherent commercial difficulty in identifying any justifiable reason why sensible commercial parties should have agreed a regime whereby deviation within the area left the Vessel on-hire but crossing just outside it took her off-hire. Such a construction was particularly uncommercial, and thus unlikely, where the area “may be difficult to identify precisely … and may be very large”.
Accordingly, the Judge determined that this was not a case where reliance upon the deletion of sub-clauses (a) and (b) was permissible as an aid to the true interpretation of the Charter, as there was no ambiguity in the wording that could be resolved by reliance on the deleted words. As a matter of ordinary and natural language, there was no reason why leaving an area could not be a “reasonable preventative measure” under sub-clause (c)(i).
Issue 2: the inference to be drawn if the deletion were admissible
On the contrary assumption, the Judge held that the deletion did not carry the inference Charterers needed to succeed. Sub-clauses (a) and (b) conferred rights “independent of, additional to, and more extensive than” those in sub-clause (c)(i). In particular, sub-clause (b) obliged the charterer to issue alternative voyage orders and to indemnify, which sub-clause (c)(i) did not replicate. The removal of one package of rights could not, therefore, have been “consistent only with an intention” to confine the other.
Subsidiary arguments
The ejusdem generis principle was not engaged. Charterers had been driven to redefine the genus as, in effect, anything short of leaving, and the words “including but not limited to” left no room for the principle in any event, following Transocean Drilling UK Ltd v Providence Resources plc (fn.3).
Further, the inclusion of the bespoke provisions of the Nigerian trading clause did not assist Charterers. The Port Harcourt and Calabar liberties were “a completely different suite of rights”, conditioned on neither piracy risk nor reasonableness. The “additional” rights conferred by the Nigerian trading clause were rights that addressed the specific scenarios identified in that clause and dis not have any bearing on, neither did they detract from, the “separate” rights of Owners under sub-clauses (c)(i), (a) or (b) of the Piracy Clause.
Comment
The decision is significant for those negotiating fixtures on recap terms and, more broadly, parties amending standard form contracts and clauses. This is for three main reasons.
First, the Judge’s analysis of Mopani, and subsequent decisions on deletion, provided clarification on the correct approach to the admissibility of deleted words. Deleted words will only be admissible and relevant where there is either ambiguity as to the retained words in the contract or the deletion assists in the determination of what the parties did not intend to agree or allow. Put simply, the Judge’s formulation of the test turns ambiguity from a factor going to weight into a threshold of admissibility.
Second, of further interest is the Judge's treatment of the charterparty as a composite of discrete “suites of rights”. The fixture was assembled from four sources—the amended NYPE form, CONWARTIME 2013, the Piracy Clause and a bespoke Nigerian trading clause—each of which conferred on Owners some liberty to take the Vessel away from danger. Charterers' case depended on reading these as correlated: the deleted sub-clauses (a) and (b) and the retained sub-clause (c)(i) were said to be materially identical in substance, so that removing the one necessarily confined the other, while the express liberties at Port Harcourt and Calabar implied the absence of any liberties at Warri. The Judge instead treated them as separable, and it is that separation, rather than any view of the word “preventative”, which carried him to the same conclusion through a second route.
Accordingly, parties that incorporate several standard forms and add bespoke terms have to be cognisant of the risks this carries: such contracts will almost inevitably contain overlapping protections, and the Court will not readily infer that a right given in one place was intended to be taken away in another, in the absence of an express term to that effect.
Third, the Judge’s analysis of the Piracy Clause as a coherent allocation of risk should alert parties to the provisions of their contracts that decide the costs, i.e. who pays for time and expenses. Those provisions are significant because their commercial rationale can point towards how widely the rights of the other should be read. A party who has agreed to bear the cost of an attack or seizure will find it difficult to argue that the other party's liberty to avoid such attack or seizure is narrow. Indeed, on the facts of this case, the Judge found that Charterers accepted the time and cost of piracy itself by agreeing to send the Vessel into a piracy area on the aforementioned terms. The same clause placed on them the cost of guards and other preventative measures, the time lost in taking them, and Owners' additional insurance premiums (under sub-clause (d)). The commercial logic behind such an allocation of risk, therefore, will point the Court to whether it should adopt a restrictive or broad construction of the respective rights and liberties of the parties.
Footnote 1: [2008] EWHC 1331 (Comm)
Footnote 2: [2016] EWCA Civ 88
Footnote 3: [2016] EWCA Civ 372